Home
Contact Us
Site Map
Lists of Completed Projects.
FY 08/09
FY 07/08
FY 06/07
FY 05/06
Completed Projects for FY 08/09
Transmission
Evaluation of VACUTAP on-Load Tap Changer for Distribution Power Transformer
Real-time Wide Area Intelligent System [Monitoring, Control and Protection] Research and Development Program – Phase 1
Study on lightning Performance Improvement of the 33kV Tanjung Batu-Rompin Overhead Distibution Line
Study on The Impact of Seasonal Variations of Soil Resistivity on The Safety of Substation Earthing Systems in TNB
Development of A Decision Making Software for the Determination of Partial Discharge Occurrence in 33kV Power Transformer by Using DGA and Artificial Neural Network
Study on Undervoltage Load Shedding (UVLS) Schemes Using Machine Intelligence Based Method
Study on Thermal Behaviour of Electrical Conductors under Constant and Dynamic Loading Conditions
Formulation of New Design & Pilot Implementation of 11kV Pole-Mounted Substations to Reduce Outages Caused by Fauna in TNB.
Distribution
Research and Development on an Intelligent System for Detection of Abnormalities and Probable Frauds by Metered Customers in TNBD
A Study to Determine The Value of Lost Load (VOLL) for Commercial & Industrial Customers for TNBD Division
Analysis & Development of Improved Methodologies for Technical Losses Estimation in TNB Distribution System ( Phase 1 )
Analysis & Development Of Improved Methodologies For Technical Losses Estimation in TNB Distribution System ( Phase 2 )
The Study of Different Cable Laying Design, The Best Practice and Ampacity Calculation
Development of Guideline in Insulation Coordination Practices for MV Overhead Distribution Systems
Study on the Performance of High Voltage Insulator Coating (HVIC) for TNBD
Development of An Intelligent Fault Detection System For High Voltage Circuit Breaker Compartment
The Study of Cable Ampacity and Derating Factors for TNBD Putrajaya Underground Cable System Installation
Development of a Decision Making Software for the Determination of Partial Discharge Occurrence in 33kV Power Transformer using DGA and Artificial Neural Network (TNB 722/2007)
Generation
Analysis of Capacity Degration for Combined Cycle Power Plant at PD1
Study of Sediment and Trash Entrainment on TNB Run-Of-River Hydro Plant Water Intakes
Study on the impact of different types of Coals to TNB Coal-Fired Power Plant Performance
Study on Gas Turbine Exhaust Stack Cracking Failure at Putrajaya Power Station
Evaluation of Electrochemical Potential (ECP) Technique for Online Monitoring of Crack Growth on TNB Power Plant Pressure Vessel Component
Design Simulation Study of Air Cooled Condenser System at Gelugor power Station for Performance improvement
Study on the Gas Turbine 1st Stage Nozzle Premature Failure and Enhancement of Refurbishment Procedures
Environment
Dam Break Study and Social, Economics and Environmental Impacts Assessment at Kenyir Power Station
Study on the Propagation of Noise from TNB Putrajaya Power Station (PJPS) and its Impact to the Surrounding Environment
Development of an Nuclear Power Plant Site Selection Procedure for Peninsular Malaysia.
Completed Projects for FY 07/08
Transmission
The Study and Investigation of Power Loss and Flux Distribution in Magnetig Transformer Core
Study on Capacitor Voltage Transformer Failures
Study on Transmission Line Route Selection Using Geographical Information System (GIS)
Design, Development, Implementation of Quality Assurance Data Warehouse for TNB Transmission Division.
Study on Tower Earthing Design to Reduce Faults on Transmission Lines due to Lightning.
Study on the Application of of Voltage Instability Predictor for Central
Study on 33KV Voltage Transformer Failures
Feasibility Study on The Wooden Cross-Arms Replacements with Steel Cross-Arms for 132KV and 275KV Transmission Towers
Distribution
The Study of Ferrule Design and Performance
Numerical Modeling * Stimulation of Electromagnetic (EM) Wave due to Partial Discharge (PD) Propagation in XLPE Cable
The Technical Evaluation of Different Core Laminar Design to Optimise 1000 KVA Distribution Transformer Design
Assesment of Fault Level Management for TNB Distribution System
Comparative Study & Evaluation on Radio Frequency and Power Line Communication (PLC) for Automated Meter Reading
SESB & Corporate
Research and Development on an Intelligent System for Prediction of Abnormalities and Probable Fraud in SESB metered Customers
Adoption Program for TNB on TNBR's Research Recommendations
Feasibility Study on the Potential of Clean Development Mechanism (CDM) in TNB
Development of a Product Certification Scheme for TNB Transmission Division
Training of 5th Batch Quality Assurance Inspector (QA)
A Study to Enhance the Value of Design and Implementation of a Quality Management System (QMS) Developed for TNB Vendors.
Development of Firefly Conservation Program at Kg. Kuantan, Kuala Selangor, Darul Ehsan
Determining the Value of Lost Load in the Malaysian Electricity Supply Industry
Development of Framework for Intellectual Property (IP) Management in TNB
Completed Projects for FY 06/07
Transmission
Evaluation and Development of Wide Area Measurement System [WAMS] for TNB Transmission Network
Pilot Study On The Use Of Gapless Transmission Line Arresters (TLA) As An Alternative To Gapped TLA In TNB Transmision
Modeling And Evaluation Of UCA Based Utility Communication Management For Power System Monitoring And Controls
Design And Development Of 145kv (Rated Voltage) Disconnector
Distribution
Assessment Of Performance Standard, Design And Maintenance Of TNB Street Lighting System
Development Of Risk Based Asset Management (RBAM) Strategies For TNB Distribution
Development And Implementation Of Feeder Automation SCADA System For TNB Distribution At Senai Industrial Area, Johor
The Application Of Frequency Dielectric Spectroscopy (FDS) Technique In Accessing The Dryness And Ageing State Of Transformer Insulation Systems
Generation
Coating Assessment For Refurbishment Exercise Of Phase 1 Waste Heat Boiler Structures At Sultan Ismail Power Station, Paka.
Dam Break Analysis And The Social, Economic And Environmental Impact Assessment For The Perak River Hydro Scheme
An Impact Study Of Different Land Use Types For The Hydro Power Generation In Cameron Highlands
Design And Development Of An On-Line Cleaning System For Generator Air Coolers Of Stesen Janaelektrik Sultan Mahmud, Kenyir
Technical Studies Of Palm Olein/Distillate Blends As Fuel For Mobile Generator Sets
Determination Of Annual Savings Via Implementation Of TNBR's Hydro Operation Optimization Decision Support Software for SSJSP
Coal Dust Dispersion Study At TNB Manjung Coal Fired Power Station And Its Impact To The Surrounding Environment
Corporate
Development of Roadmap for Integrated Vehicle Fleet Management – Detailed Action Plans for Implementation
A Study On Energy Efficient Building Best Practices For Potential Adaptation In TNB’s Proposed New Head Quarters
Environmental Reporting In TNB
SESB
Simulation Based Frequent Tripping Study On The 11kv SESB network
Development & Implementation Of An Asset Optimization Program For SESB Power Plant.
List of Completed Project for FY 05/06
Transmission
On-site Testing Of SF6 Gas Spectrometry For High Voltage Circuit Breakers
Measurement Of Footing Resistance Of Transmission Towers: Methods, Instruments And Practice
Corrosion Survey On 132 And 275kV TNB Transmission Towers
Root Cause Analysis Of Trench Capacitor Voltage Transformer Failure
Evaluation of Alternative Earthing Materials in Substations
Advanced Techniques For The Simulation And Testing of Protective Relays
Enhancing Technical Competencies In HV Engineering And Diagnostic
Distribution
Investigation of The Growth of Water Trees in XLPE Cables
The Study On Evaluation Of Different Types Of 11kV Cable Joints For Underground Cable For TNB Distribution Sdn. Bhd.
Load Profiling for Different Customer Clusters in Putrajaya and Cyberjaya
Development of Customer Load Profile Database and Applications
An Environmental Effect And Deposition Accumulation Study On Switchgears
Research And Test On The Stationary, Standby Batteries At TNB Substation/Power Station And The Development Of A Comprehensive And Effective Maintenance Strategy For The Batteries
Metering Design for Indoor/Outdoor Substations and Feeder Pillars
The Development Of Second Generation Of Earth Fault Indicator (EFI) For 11kV Underground Distribution Network
Development And Implementation Of PE RMU Switchgear Automation System For TNBD Gebeng Industrial Area, Penang, Perak, Selangor, Putrajaya And Metropolitan KL
Reliability And Performance Analysis Of Stand Alone Photovoltaic System
Feasibility Study On Single Point Sheath Earthing For Single Core Cables
Measuring Electric And Magnetic Field Under TNB Rentice
Development Of Single-Phase Smart Card Electronic Meter For Prepayment Metering System
To Perform A Market Research Survey on the High Current Low Voltage (HCLV) Laboratory Development
Generation
Study On GIS Technology Application In Inventory And Electronic Mapping Of The Kenyir Hydroelectric Catchment And The Proposed Ulu Terengganu And Ulu Jelai Hydroelectric Projects.
The Study On Scaling Of Cooling Water Tubes And Related Problems At TNB Liberty Power Limited Power Plant, Pakistan.
A Study On Biomass-coal Blend As Renewable Fuel For Power Generation In Malaysia.
Technical Studies Of Palm Olein/Distillate Oil Blends As Fuel For Gas Turbine.
Development Of Expertise In The Area Of Risk/Reliability Based Maintenance And Condition Monitoring For TNB Power Plants.
Corporate
Establishment of the Third and Fourth Batch of Quality Assurance Inspectors for TNB
Development And Implementation Of A Virtual Learning System For Knowledge Sharing And Competency Improvement At TNBR
Development And Implementation Of E-Learning Infrastructure For Universiti Tenaga Nasional
TNB’s QCS-IT Product Enhancement
Development of Powerline Communication on Medium Voltage(MV) Distribution Network for SCADA
Measurement Program on LV/MV Network for Digital Power Line (DPL) Communication System
SESB
Rentice Management Study for SESB Distribution Network
Assessment of LV Losses in the SESB Network
Condition and Life Assessment of Heat Recovery Boiler and Steam Condenser at Patau-Patau Power Station
A Study On Tenom Pangi Hydropower Station Trash Rack Problem
An Integrated Study To Re-enhance The Operation Of Cooling Water System For Tenom Pangi Power Station
Copyright 2007 TNB Research Sdn Bhd